Construction drawings were provided of an existing Preliminary and Detail Design by Prof. A.M.Kotsiopoulos. The Complex of the Mineral Sources Engineers Section is part of the Polytechnic School of Crete.
The total complex consists of three blocks: a) Laboratory wings. This block was the first to be built, b) The main block, including a canteen, a secretariat, management offices and laboratories (mainly equipped with computers) and c) the classrooms block with the included square.
The second and third blocks were built at a later stage, together with the central square of the isle and the main walkways of the campus.
NATURAL RESOURCES LABORATORIES
CLIENT
J/V TEGEA S.A. - KATASKEVASTIKI Ltd
COMPLETED
1990
TOTAL AREA
6,200 m²
PROJECT PHASE
DETAILED DESIGN, CONSTRUCTION DRAWINGS
LOCATION
ISLAND OF CRETE, GREECE